Binghatti Starlight, located in Healthcare City Phase 2, Al Jaddaf, is an upcoming architectural marvel that offers the perks of waterfront living with a touch of elegance. The residential tower with 25 stories is under construction. The project offers more than just a house, with its open floor layouts, spacious interiors and superior finishes. A thoughtfully designed substructure comprises three basement levels dedicated to parking. The tower includes a ground floor, mezzanine, and two podium levels, culminating in 20 residential floors and a rooftop area. Every space is fabricated in a fine manner and brings together modern design with all the requisites of comfort.
This upcoming masterpiece by Binghatti Developers is planned in an area known for its premium sea-side apartments and sumptuous boutique hotels. The serene waters of Dubai Creek and views of the majestic Burj Khalifa will make any sunset moment a picturesque experience while living here. Both Downtown Dubai and Dubai Creek Tower are just a five-minute drive from here. You can drive to Palm Jumeirah in 10 minutes and easily reach other main destinations like Zabeel Stadium, Dubai Design District, Creek Park, or the Dubai Museum also within minutes.
The neighborhood itself spreads over an area of 176 hectares close to Dubai Creek, along Oud Metha Road. The wellness-focused mixed-use development is not just about living spaces but also offers facilities for long-term care, spa resorts, sports medicine centers, nutrition hubs—everything that goes toward a holistic environment for a balanced lifestyle.
The project is planned to be ready by March 31, 2026 and developer will offer a convenient method for payments, keeping it flexible and easy.
Key Highlights:
- A 25-storey residential complex with 3 basement levels, a ground floor, podium, and 20 residential levels.
- In the mid of Al Jaddaf’s Healthcare City Phase 2.
- Close to retail outlets, schools, malls, restaurants, healthcare centers, and business hubs.
- Attractions like Dubai Marina, Burj Khalifs, Downtown Dubai, and Dubai Creek Tower within 10 minutes.
- Handover planned by the end of Q1 in 2026.
- Flexible modes of payment with instalments.